Information Journal Paper
APA:
CopyTAVAKOLI MOGHADAM, R., JOULAEI, F., & GHANDI BIDGOLI, S.. (2009). A PARALLEL MACHINE SCHEDULING PROBLEM MINIMIZING THE TOTAL WEIGHTED EARLINESS AND TOTAL WEIGHTED TARDINESS BY A MULTI-OBJECTIVE SCATTER SEARCH METHOD. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), 42(7 (117)), 923-934. SID. https://sid.ir/paper/14107/en
Vancouver:
CopyTAVAKOLI MOGHADAM R., JOULAEI F., GHANDI BIDGOLI S.. A PARALLEL MACHINE SCHEDULING PROBLEM MINIMIZING THE TOTAL WEIGHTED EARLINESS AND TOTAL WEIGHTED TARDINESS BY A MULTI-OBJECTIVE SCATTER SEARCH METHOD. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN)[Internet]. 2009;42(7 (117)):923-934. Available from: https://sid.ir/paper/14107/en
IEEE:
CopyR. TAVAKOLI MOGHADAM, F. JOULAEI, and S. GHANDI BIDGOLI, “A PARALLEL MACHINE SCHEDULING PROBLEM MINIMIZING THE TOTAL WEIGHTED EARLINESS AND TOTAL WEIGHTED TARDINESS BY A MULTI-OBJECTIVE SCATTER SEARCH METHOD,” JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), vol. 42, no. 7 (117), pp. 923–934, 2009, [Online]. Available: https://sid.ir/paper/14107/en