مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Journal Paper

Paper Information

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,094
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

MODELING RAILWAY CREW SCHEDULING AND HEURISTIC SOLUTION WITH CONSTRAINTS LOGIC PATTERN

Pages

  603-622

Keywords

Not Registered.

Abstract

 In this paper we address the railway crew-scheduling problem, for which we have solved it for head of crew (train master) in passenger trains with real data of Iranian I.R. Railways. All possible activities of crew during a period of time are classified into two groups of activities, tasks and transfers. First, these activities and the precedence relationships among them are shown graphically by a multi depot network containing tasks and transfers arcs. According to the designed network, a new mathematical model, is, then, presented which is able to optimally solve small and medium size problems. In order to solve large size or real world problems, a heuristic algorithm which is called constraints logic pattern is developed. Based on real data taken from passenger train scheduling of Iranian Railways, using branch and bound method, several problems in different sizes are solved. These problems are, also, solved and compared by a simplified method and the constraints logic pattern method. By comparing these two latter heuristic solution approaches with the present approach at Iranian Railways, it is concluded that constraints logic pattern, while improving quality of solutions, can solve real world problems and provide noticeable savings.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SEPEHRI, M.M., & HAJFATHALIHA, A.. (2002). MODELING RAILWAY CREW SCHEDULING AND HEURISTIC SOLUTION WITH CONSTRAINTS LOGIC PATTERN. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), 35(4 (74)), 603-622. SID. https://sid.ir/paper/14244/en

    Vancouver: Copy

    SEPEHRI M.M., HAJFATHALIHA A.. MODELING RAILWAY CREW SCHEDULING AND HEURISTIC SOLUTION WITH CONSTRAINTS LOGIC PATTERN. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN)[Internet]. 2002;35(4 (74)):603-622. Available from: https://sid.ir/paper/14244/en

    IEEE: Copy

    M.M. SEPEHRI, and A. HAJFATHALIHA, “MODELING RAILWAY CREW SCHEDULING AND HEURISTIC SOLUTION WITH CONSTRAINTS LOGIC PATTERN,” JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), vol. 35, no. 4 (74), pp. 603–622, 2002, [Online]. Available: https://sid.ir/paper/14244/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button