Information Journal Paper
APA:
CopyMIKAEIL, R., JAFARNEJAD GHARAHASANLOU, E., & ARYAFAR, A.. (2018). GEOTECHNICAL RISKS ASSESSMENT DURING THE SECOND PART OF EMAMZADEH HASHEM (AS) TUNNEL USING FDAHP-PROMETHEE. AMIRKABIR JOURNAL OF CIVIL ENGINEERING (AMIRKABIR), 49(4 ), 791-800. SID. https://sid.ir/paper/165594/en
Vancouver:
CopyMIKAEIL R., JAFARNEJAD GHARAHASANLOU E., ARYAFAR A.. GEOTECHNICAL RISKS ASSESSMENT DURING THE SECOND PART OF EMAMZADEH HASHEM (AS) TUNNEL USING FDAHP-PROMETHEE. AMIRKABIR JOURNAL OF CIVIL ENGINEERING (AMIRKABIR)[Internet]. 2018;49(4 ):791-800. Available from: https://sid.ir/paper/165594/en
IEEE:
CopyR. MIKAEIL, E. JAFARNEJAD GHARAHASANLOU, and A. ARYAFAR, “GEOTECHNICAL RISKS ASSESSMENT DURING THE SECOND PART OF EMAMZADEH HASHEM (AS) TUNNEL USING FDAHP-PROMETHEE,” AMIRKABIR JOURNAL OF CIVIL ENGINEERING (AMIRKABIR), vol. 49, no. 4 , pp. 791–800, 2018, [Online]. Available: https://sid.ir/paper/165594/en