Information Journal Paper
APA:
CopyRezghi, Adeleh, & REZAEIAN, JAVAD. (2018). Two stage assembly flow shop scheduling problem with preventive maintenance, aging effect and release time. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 52(1 ), 49-60. SID. https://sid.ir/paper/166469/en
Vancouver:
CopyRezghi Adeleh, REZAEIAN JAVAD. Two stage assembly flow shop scheduling problem with preventive maintenance, aging effect and release time. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2018;52(1 ):49-60. Available from: https://sid.ir/paper/166469/en
IEEE:
CopyAdeleh Rezghi, and JAVAD REZAEIAN, “Two stage assembly flow shop scheduling problem with preventive maintenance, aging effect and release time,” ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 52, no. 1 , pp. 49–60, 2018, [Online]. Available: https://sid.ir/paper/166469/en