Information Journal Paper
APA:
CopyBashi Varshosaz, M., NADERI, B., & MOHAMMADI, M.. (2018). Modeling and Scheduling Two-stage Assembly Flow Shop Problems with Non-Identical Assembly Machines. JOURNAL OF COMPUTATIONAL METHODS IN ENGINEERING (ESTEGHLAL), 37(1 ), 65-81. SID. https://sid.ir/paper/173649/en
Vancouver:
CopyBashi Varshosaz M., NADERI B., MOHAMMADI M.. Modeling and Scheduling Two-stage Assembly Flow Shop Problems with Non-Identical Assembly Machines. JOURNAL OF COMPUTATIONAL METHODS IN ENGINEERING (ESTEGHLAL)[Internet]. 2018;37(1 ):65-81. Available from: https://sid.ir/paper/173649/en
IEEE:
CopyM. Bashi Varshosaz, B. NADERI, and M. MOHAMMADI, “Modeling and Scheduling Two-stage Assembly Flow Shop Problems with Non-Identical Assembly Machines,” JOURNAL OF COMPUTATIONAL METHODS IN ENGINEERING (ESTEGHLAL), vol. 37, no. 1 , pp. 65–81, 2018, [Online]. Available: https://sid.ir/paper/173649/en