مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

806
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

IMPROVING COMPENSATION OF TURBO-EXPANDER STARTING BY MODIFIED DVR AND STATCOM IN NEKA POWER PLANT UNDER FAULT CONDITION

Pages

  2-15

Abstract

 In order to prevent energy waste by throttle valve in gas pressure reducing station of Neka thermal power plant, a TURBO-EXPANDER with a capacity of 9.8 MW for the power plant was prepared and installed. Due to the absorption of 63 MVAr reactive powers at the moment of TURBO-EXPANDER STARTING, resulted in severe voltage drops in the power plant auxiliary service system. In this paper, while pathology of fault effect on TURBO-EXPANDER operation will be considered its performance Improvement in the event of grid fault using modified DVR and STATCOM is also considered. To improve performance of DVR, a review of all topologies and control strategies of DVR COMPENSATOR and improved topology is presented. Then, for optimal performance of COMPENSATORs the possible points presence on the auxiliary service system of Neka power plant in various scenarios under conditions of sever disturbance, synchronization of fault occurring conditions and STARTING are tested. The results of PSCAD / EMTDC software simulation show by using improved topology and minimum injection active power strategy of DVR, severe voltage sag compensated in various scenarios and can provide the total auxiliary service system power consumption of this power plant by TURBO-EXPANDER instead of using the generation of power plant.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    OLAMAEI, JAVAD, NOROUZI, MOHAMMAD ALI, & Gharehpetian, Gevork B.. (2016). IMPROVING COMPENSATION OF TURBO-EXPANDER STARTING BY MODIFIED DVR AND STATCOM IN NEKA POWER PLANT UNDER FAULT CONDITION. JOURNAL OF ENERGY MANAGEMENT, 6(1), 2-15. SID. https://sid.ir/paper/223762/en

    Vancouver: Copy

    OLAMAEI JAVAD, NOROUZI MOHAMMAD ALI, Gharehpetian Gevork B.. IMPROVING COMPENSATION OF TURBO-EXPANDER STARTING BY MODIFIED DVR AND STATCOM IN NEKA POWER PLANT UNDER FAULT CONDITION. JOURNAL OF ENERGY MANAGEMENT[Internet]. 2016;6(1):2-15. Available from: https://sid.ir/paper/223762/en

    IEEE: Copy

    JAVAD OLAMAEI, MOHAMMAD ALI NOROUZI, and Gevork B. Gharehpetian, “IMPROVING COMPENSATION OF TURBO-EXPANDER STARTING BY MODIFIED DVR AND STATCOM IN NEKA POWER PLANT UNDER FAULT CONDITION,” JOURNAL OF ENERGY MANAGEMENT, vol. 6, no. 1, pp. 2–15, 2016, [Online]. Available: https://sid.ir/paper/223762/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button