مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

721
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

NEW MODEL OF B.O.T CONTRACTS TO DETERMINE CONCESSION PERIOD AND TRANSFER POINT FOR BUILDING POWER PLANTS

Author(s)

EMAMIAM SOHEL | JALALI NAEENI SAYED GHOLAMREZA | SHAHNAGHI KAMRAN | Issue Writer Certificate 

Pages

  41-50

Abstract

 In the developing countries, there is an interest to attract investments in private and foreign sectors due to the lack of financial resource required for infrastructure projects. BUILD-Operate-Transfer (BOT) method is one of the approaches in which the private sector is assigned to construct the project and gains its own interest after which it transfers the project to the government. In this paper, according to the proposed case study, a method was obtained to determine the CONCESSION PERIOD length and the transfer point of project by taking into account both parties' willingness, effects of risks and uncertainty regarding the project's parameters, considering the lack of complete information at least for one party by using bargaining game theory and MONTE-CARLO SIMULATION.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    EMAMIAM, SOHEL, JALALI NAEENI, SAYED GHOLAMREZA, & SHAHNAGHI, KAMRAN. (2017). NEW MODEL OF B.O.T CONTRACTS TO DETERMINE CONCESSION PERIOD AND TRANSFER POINT FOR BUILDING POWER PLANTS. IRANIAN ELECTRIC INDUSTRY JOURNAL OF QUALITY AND PRODUCTIVITY (IEIJQP), 5(10), 41-50. SID. https://sid.ir/paper/226205/en

    Vancouver: Copy

    EMAMIAM SOHEL, JALALI NAEENI SAYED GHOLAMREZA, SHAHNAGHI KAMRAN. NEW MODEL OF B.O.T CONTRACTS TO DETERMINE CONCESSION PERIOD AND TRANSFER POINT FOR BUILDING POWER PLANTS. IRANIAN ELECTRIC INDUSTRY JOURNAL OF QUALITY AND PRODUCTIVITY (IEIJQP)[Internet]. 2017;5(10):41-50. Available from: https://sid.ir/paper/226205/en

    IEEE: Copy

    SOHEL EMAMIAM, SAYED GHOLAMREZA JALALI NAEENI, and KAMRAN SHAHNAGHI, “NEW MODEL OF B.O.T CONTRACTS TO DETERMINE CONCESSION PERIOD AND TRANSFER POINT FOR BUILDING POWER PLANTS,” IRANIAN ELECTRIC INDUSTRY JOURNAL OF QUALITY AND PRODUCTIVITY (IEIJQP), vol. 5, no. 10, pp. 41–50, 2017, [Online]. Available: https://sid.ir/paper/226205/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button