مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,057
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

1

Information Journal Paper

Title

TIME STUDY OF SKIDDER HSM 904

Pages

  921-930

Abstract

TIME STUDY on the skidder recently bought by the Mazandaran Wood and Paper Industries Company was aimed at estimating the amount and cost of machine production in different conditions, management, harvest planning, replacement of new machines and defining new labor systems. Recently ten HSM904 skidders have been bought by Mazandaran Wood and Paper Industries Company. TIME STUDY on skidders have been carried out to obtain a mathematical model and to calculate the production cost. Our study shows that the time of traveling depends on skidding distance and the number of logs carried in each travel but there isn't any significant relation between volume and slope and travel time. Because the volume carried by a skidder has been less than the power of machine there isn't any significant relation between volume and travel time. The lack of a significant relation between volume of loading and travel time arise from the fact that the volume of the loading in each time has always been lower than the machine's power. Furthermore, low gradient of skid trail (less than 25%) cannot decrease the machine power significantly. A model for mathematical computation, Y = 1.873 + 0.024494D + 2.499N, was developed and hour production and HOUR COST were calculated to be 6.53 m3 and is 384803 RLS. Training choker men, modifying dump and cable connection form and driver cabin also substantially improve efficiency, safety and helps better utilization of machine in northern forests of Iran.

Cites

References

  • No record.
  • Cite

    APA: Copy

    NAJAFI, A., SOBHANI, H., SAEID, A., MAKHDOUM, M., & MARVI MOHAJER, M.R.. (2007). TIME STUDY OF SKIDDER HSM 904. IRANIAN JOURNAL OF NATURAL RESOURCES, 60(3), 921-930. SID. https://sid.ir/paper/22933/en

    Vancouver: Copy

    NAJAFI A., SOBHANI H., SAEID A., MAKHDOUM M., MARVI MOHAJER M.R.. TIME STUDY OF SKIDDER HSM 904. IRANIAN JOURNAL OF NATURAL RESOURCES[Internet]. 2007;60(3):921-930. Available from: https://sid.ir/paper/22933/en

    IEEE: Copy

    A. NAJAFI, H. SOBHANI, A. SAEID, M. MAKHDOUM, and M.R. MARVI MOHAJER, “TIME STUDY OF SKIDDER HSM 904,” IRANIAN JOURNAL OF NATURAL RESOURCES, vol. 60, no. 3, pp. 921–930, 2007, [Online]. Available: https://sid.ir/paper/22933/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button