مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

678
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Studying the main factors and prioritizing the flooding potential of subwatersheds using fuzzy topsis and electre III, case study: Sarkhoon Watershed

Pages

  493-507

Abstract

 Exact estimation of flood-water peak discharge and prioritizing the Flooding Potential in subwatersheds in main watersheds is necessary (because of cost, watershed restoring is not practicable in all subwatersheds), moreover flood may occur only in some specefic subwatersheds. This study was conducted in Sarkhoon Watershed of Bandarabbas (South of Iran) with the aim of developing a flood prioritizing method in small catchments. The resarch was carried out using ElectreIII and Fuzzy Topsis methods belonging to multicriteria models. For the analysis, 7 criterions were selected that includes: Basin mean weight slope, gravilus coefficient, permeability, runoff coefficient, shape coefficient, vegetation cover and rainfall intensity with 25, 50 and 100 years return periods. Then the criterion weights were determined using AHP method and for selecting the best hierarchy and function of electre III and Fuzzy Topsis, the spearman coefficient were utilized and the results showed a correlation coefficient of 0. 8 between predicted and actual flood peak values. In the final step the Combination Method for the final prioritizing was adopted. Results showed that subwatersheds 18-1-1, 14 and 18-1-2 have more flooding peak. It was concluded that the Combination Method can promise as a suitable method for prioritizing the Flooding Potential in subwtersheds.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    PARVARESH, ELYAS, MAHDAVI, RASOL, MALEKIAN, ARASH, Esmaelpour, Yahya, & HOLISAZ, ARASHK. (2019). Studying the main factors and prioritizing the flooding potential of subwatersheds using fuzzy topsis and electre III, case study: Sarkhoon Watershed. WATERSHED ENGINEERING AND MANAGEMENT, 11(2 ), 493-507. SID. https://sid.ir/paper/234853/en

    Vancouver: Copy

    PARVARESH ELYAS, MAHDAVI RASOL, MALEKIAN ARASH, Esmaelpour Yahya, HOLISAZ ARASHK. Studying the main factors and prioritizing the flooding potential of subwatersheds using fuzzy topsis and electre III, case study: Sarkhoon Watershed. WATERSHED ENGINEERING AND MANAGEMENT[Internet]. 2019;11(2 ):493-507. Available from: https://sid.ir/paper/234853/en

    IEEE: Copy

    ELYAS PARVARESH, RASOL MAHDAVI, ARASH MALEKIAN, Yahya Esmaelpour, and ARASHK HOLISAZ, “Studying the main factors and prioritizing the flooding potential of subwatersheds using fuzzy topsis and electre III, case study: Sarkhoon Watershed,” WATERSHED ENGINEERING AND MANAGEMENT, vol. 11, no. 2 , pp. 493–507, 2019, [Online]. Available: https://sid.ir/paper/234853/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button