مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

721
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

MULTI-OBJECTIVE PRODUCTION NETWORK SCHEDULING USING SUB-POPULATION GENETIC ALGORITHM AND ELASTIC METHOD

Pages

  133-147

Abstract

 Department of Industrial Engineering, Faculty of Engineering, Bu-Ali Sina University, Hamedan, Iran. The globalization trend causes the emergence of intense competition among manufacturers to gain more profits. In order to be competitive in today’s rapidly changing business world, organizations have shifted from a centralized single factory production to a decentralized multi-factory structure. We assume that production takes place in several factories, which may be geographically distributed in different locations, in order to comply with and to take advantage from the trend of globalization. This allows them to be closer to their customers, to employ professionals, to comply with local laws, to focus on a few product types, to produce and market their products more effectively, and respond to market changes more quickly. These can be attained by transporting the jobs from an overloaded factory to the factory which has fewer workloads. Obviously, considering these assumptions, as well as MULTI-OBJECTIVE SCHEDULING are surely more practical than those scheduling problems which do not take them into account. In this research, after formulating the scheduling problem as a mixed integer linear programming for simultaneous minimization of the sum of the earliness and tardiness of jobs and the total completion time, a new exact method and a multi-objective metaheuristic algorithm are proposed. Finally, the heuristic algorithm and the output of particle swarm-based algorithm are reported.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    BEHNAMIAN, J.. (2016). MULTI-OBJECTIVE PRODUCTION NETWORK SCHEDULING USING SUB-POPULATION GENETIC ALGORITHM AND ELASTIC METHOD. JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH IN PRODUCTION SYSTEMS (IERPS), 3(6), 133-147. SID. https://sid.ir/paper/241311/en

    Vancouver: Copy

    BEHNAMIAN J.. MULTI-OBJECTIVE PRODUCTION NETWORK SCHEDULING USING SUB-POPULATION GENETIC ALGORITHM AND ELASTIC METHOD. JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH IN PRODUCTION SYSTEMS (IERPS)[Internet]. 2016;3(6):133-147. Available from: https://sid.ir/paper/241311/en

    IEEE: Copy

    J. BEHNAMIAN, “MULTI-OBJECTIVE PRODUCTION NETWORK SCHEDULING USING SUB-POPULATION GENETIC ALGORITHM AND ELASTIC METHOD,” JOURNAL OF INDUSTRIAL ENGINEERING RESEARCH IN PRODUCTION SYSTEMS (IERPS), vol. 3, no. 6, pp. 133–147, 2016, [Online]. Available: https://sid.ir/paper/241311/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button