مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,195
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

373
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

ESTIMATION OF PENETRATION RATE OF TUNNEL BORING MACHINES USING MONTE-CARLO SIMULATION METHOD

Pages

  175-184

Keywords

TBMQ1
MONTE-CARLO (MC) SIMULATIONQ1

Abstract

 One of the most important parameters used for determining the performance of tunnel boring machines (TBMs) is their PENETRATION RATE. The parameters affecting the PENETRATION RATE can be divided in two categories. The first category is the controllable parameters such as the TBM technical characteristics, and type and geometry of the tunnel, and the second one is the uncontrollable parameters such as the intact rock properties and characteristics of the rock mass discontinuities. The aim of this work was to investigate the effects of rock mass properties on the PENETRATION RATE, and to present a new mathematical equation based on a statistical approach to estimate the TBM performance. To achieve this aim, the Monte-Carlo (MC) simulation method was used to model the TBM performance. Accordingly, the database consisting of the rock mechanics information such as the uniaxial compressive strength, Brazilian tensile strength, toughness and hardness of rock, spacing and orientation of discontinuities, and measured TBM PENETRATION RATE in 151 points out of a water tunnel was collected. Next, using the DIMENSIONAL ANALYSIS, a comprehensive mathematical equation was obtained to calculate the TBM PENETRATION RATEs using the developed database. Finally, using the MC simulation method, the probability distribution function of the TBM PENETRATION RATE was studied. The validation results obtained showed that the root mean square error (RMSE) of the proposed relationship was less than 0.3. The MC simulation results showed that hardness and density had the most and least effects on the PENETRATION RATE, respectively.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    DEHGHANI, H., & MIKHAK BEIRANVAND, N.. (2016). ESTIMATION OF PENETRATION RATE OF TUNNEL BORING MACHINES USING MONTE-CARLO SIMULATION METHOD. JOURNAL OF MINING AND ENVIRONMENTAL (INTERNATIONAL JOURNAL OF MINING & ENVIRONMENTAL ISSUES), 7(2), 175-184. SID. https://sid.ir/paper/256360/en

    Vancouver: Copy

    DEHGHANI H., MIKHAK BEIRANVAND N.. ESTIMATION OF PENETRATION RATE OF TUNNEL BORING MACHINES USING MONTE-CARLO SIMULATION METHOD. JOURNAL OF MINING AND ENVIRONMENTAL (INTERNATIONAL JOURNAL OF MINING & ENVIRONMENTAL ISSUES)[Internet]. 2016;7(2):175-184. Available from: https://sid.ir/paper/256360/en

    IEEE: Copy

    H. DEHGHANI, and N. MIKHAK BEIRANVAND, “ESTIMATION OF PENETRATION RATE OF TUNNEL BORING MACHINES USING MONTE-CARLO SIMULATION METHOD,” JOURNAL OF MINING AND ENVIRONMENTAL (INTERNATIONAL JOURNAL OF MINING & ENVIRONMENTAL ISSUES), vol. 7, no. 2, pp. 175–184, 2016, [Online]. Available: https://sid.ir/paper/256360/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button