مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

466
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

285
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A FUZZY MODELING APPROACH TO WEATHER DELAYS ANALYSIS IN CONSTRUCTION PROJECTS

Pages

  169-181

Abstract

 Project participants are becoming more aware of the high costs and risks associated with delay claims and their litigation. Among delays, WEATHER DELAY has an important role in projects performed in severe environmental conditions. This research is the extension of delay analysis techniques by approving analysis of WEATHER DELAYs using FUZZY LOGIC. At the presented technique, first using a FUZZY LOGIC model calculated the delay that occurred during the activity execution after weather event; then by the selected delay analysis method (Time impact analysis) and using the risk of the contractor during the contract approval together with the effect of previous delay in changing the duration of activities, analyzed WEATHER DELAYs in construction project. A local general contractor and governmental firms involved in a highway construction project practiced by offering their experienced and knowledge in delay analysis procedures to provide data for development and testing of the model specified for rain events. The results indicated that the presented model is in accordance with practical experiences in WEATHER DELAY duration except in some circumstances that can be divided into the separated parts. It also advances the use of FUZZY LOGIC in delay analysis procedures and becomes it more systematic special for WEATHER DELAYs.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SEBT, M.H., RAJAEI, H., & PAKSERESHT, M.M.. (2007). A FUZZY MODELING APPROACH TO WEATHER DELAYS ANALYSIS IN CONSTRUCTION PROJECTS. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 5(3), 169-181. SID. https://sid.ir/paper/271758/en

    Vancouver: Copy

    SEBT M.H., RAJAEI H., PAKSERESHT M.M.. A FUZZY MODELING APPROACH TO WEATHER DELAYS ANALYSIS IN CONSTRUCTION PROJECTS. INTERNATIONAL JOURNAL OF CIVIL ENGINEERING[Internet]. 2007;5(3):169-181. Available from: https://sid.ir/paper/271758/en

    IEEE: Copy

    M.H. SEBT, H. RAJAEI, and M.M. PAKSERESHT, “A FUZZY MODELING APPROACH TO WEATHER DELAYS ANALYSIS IN CONSTRUCTION PROJECTS,” INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, vol. 5, no. 3, pp. 169–181, 2007, [Online]. Available: https://sid.ir/paper/271758/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button