مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

402
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

122
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

BUDGETARY CONSTRAINTS AND IDLE TIME ALLOCATION IN COMMON-CYCLE PRODUCTION WITH NON-ZERO SETUP TIME

Pages

  18-32

Abstract

 Economic lot size scheduling problem (ELSP) for a multi-product single machine system is a classical problem. This paper considers ELSP with budgetary constraint as an important aspect of such systems. In the real world situations the available funds for investment in inventory is limited. By adopting the common cycle time approach to ELSP, we obtain the optimal common cycle which minimizes the total inventory ordering and holding costs for the case of nonzero setup times. One aspect of the scheduling is to decide what should be the sequence of production runs and how the idle times shall be distributed in the common cycle time. For such a SEQUENCING problem, we consider two cases: a) the common cycle time is given, and b) the common cycle time is a decision variable. In the literature, scheduling rules are introduced for both cases, which assume that the total idle time is located at the end of each cycle. This paper relaxes this assumption and provides: i) a rule to optimize the production sequence and the length of idle times before (or after) producing each item, for both cases (a) and (b), and ii) the optimal common cycle for case (b). The presented rule is interestingly general, simple and easy-to-apply.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    HAJI, RASOUL, HAJI, ALIREZA, & ARDALAN, ALI. (2010). BUDGETARY CONSTRAINTS AND IDLE TIME ALLOCATION IN COMMON-CYCLE PRODUCTION WITH NON-ZERO SETUP TIME. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), 4(1), 18-32. SID. https://sid.ir/paper/307118/en

    Vancouver: Copy

    HAJI RASOUL, HAJI ALIREZA, ARDALAN ALI. BUDGETARY CONSTRAINTS AND IDLE TIME ALLOCATION IN COMMON-CYCLE PRODUCTION WITH NON-ZERO SETUP TIME. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE)[Internet]. 2010;4(1):18-32. Available from: https://sid.ir/paper/307118/en

    IEEE: Copy

    RASOUL HAJI, ALIREZA HAJI, and ALI ARDALAN, “BUDGETARY CONSTRAINTS AND IDLE TIME ALLOCATION IN COMMON-CYCLE PRODUCTION WITH NON-ZERO SETUP TIME,” JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), vol. 4, no. 1, pp. 18–32, 2010, [Online]. Available: https://sid.ir/paper/307118/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button