Information Journal Paper
APA:
CopyHAJI, RASOUL, HAJI, ALIREZA, & ARDALAN, ALI. (2010). BUDGETARY CONSTRAINTS AND IDLE TIME ALLOCATION IN COMMON-CYCLE PRODUCTION WITH NON-ZERO SETUP TIME. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), 4(1), 18-32. SID. https://sid.ir/paper/307118/en
Vancouver:
CopyHAJI RASOUL, HAJI ALIREZA, ARDALAN ALI. BUDGETARY CONSTRAINTS AND IDLE TIME ALLOCATION IN COMMON-CYCLE PRODUCTION WITH NON-ZERO SETUP TIME. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE)[Internet]. 2010;4(1):18-32. Available from: https://sid.ir/paper/307118/en
IEEE:
CopyRASOUL HAJI, ALIREZA HAJI, and ALI ARDALAN, “BUDGETARY CONSTRAINTS AND IDLE TIME ALLOCATION IN COMMON-CYCLE PRODUCTION WITH NON-ZERO SETUP TIME,” JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), vol. 4, no. 1, pp. 18–32, 2010, [Online]. Available: https://sid.ir/paper/307118/en