Information Journal Paper
APA:
CopyZHANG, JING, & KHOSHNEVIS, BEHROKH. (2010). CONTOUR CRAFTING PROCESS PLAN OPTIMIZATION PART II: MULTI–MACHINE CASES. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), 4(2), 77-94. SID. https://sid.ir/paper/307124/en
Vancouver:
CopyZHANG JING, KHOSHNEVIS BEHROKH. CONTOUR CRAFTING PROCESS PLAN OPTIMIZATION PART II: MULTI–MACHINE CASES. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE)[Internet]. 2010;4(2):77-94. Available from: https://sid.ir/paper/307124/en
IEEE:
CopyJING ZHANG, and BEHROKH KHOSHNEVIS, “CONTOUR CRAFTING PROCESS PLAN OPTIMIZATION PART II: MULTI–MACHINE CASES,” JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), vol. 4, no. 2, pp. 77–94, 2010, [Online]. Available: https://sid.ir/paper/307124/en