Information Journal Paper
APA:
CopyGHARAHGOUZLI, A.H., TAVAKOLI MOGHADAM, R., RABANI, M., & ZAERPOUR, N.. (2008). A FUZZY MIXED-INTEGER GOAL PROGRAMMING MODEL FOR A PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND RELEASE DATES. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, 4(7), 38-47. SID. https://sid.ir/paper/309781/en
Vancouver:
CopyGHARAHGOUZLI A.H., TAVAKOLI MOGHADAM R., RABANI M., ZAERPOUR N.. A FUZZY MIXED-INTEGER GOAL PROGRAMMING MODEL FOR A PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND RELEASE DATES. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL[Internet]. 2008;4(7):38-47. Available from: https://sid.ir/paper/309781/en
IEEE:
CopyA.H. GHARAHGOUZLI, R. TAVAKOLI MOGHADAM, M. RABANI, and N. ZAERPOUR, “A FUZZY MIXED-INTEGER GOAL PROGRAMMING MODEL FOR A PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND RELEASE DATES,” JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, vol. 4, no. 7, pp. 38–47, 2008, [Online]. Available: https://sid.ir/paper/309781/en