مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

401
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

123
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A FUZZY MIXED-INTEGER GOAL PROGRAMMING MODEL FOR A PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND RELEASE DATES

Pages

  38-47

Abstract

 This paper presents a new MIXED-INTEGER GOAL PROGRAMMING (MIGP) model for a PARALLEL MACHINE SCHEDULING problem with SEQUENCE-DEPENDENT SETUP TIMEs and RELEASE DATEs. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the complexity of the above model and uncertainty involved in real-world scheduling problems, it is sometimes unrealistic or even impossible to acquire exact input data. Hence, we consider the parallel-machine scheduling problem with sequence-dependent set-up times under the hypothesis of fuzzy processing time's knowledge and two fuzzy objectives as the MIGP model. In addition, a quite effective and applicable methodology for solving the above fuzzy model is presented. At the end, the effectiveness of the proposed model and the denoted methodology is demonstrated through some test problems.

Cites

  • No record.
  • References

    Cite

    APA: Copy

    GHARAHGOUZLI, A.H., TAVAKOLI MOGHADAM, R., RABANI, M., & ZAERPOUR, N.. (2008). A FUZZY MIXED-INTEGER GOAL PROGRAMMING MODEL FOR A PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND RELEASE DATES. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, 4(7), 38-47. SID. https://sid.ir/paper/309781/en

    Vancouver: Copy

    GHARAHGOUZLI A.H., TAVAKOLI MOGHADAM R., RABANI M., ZAERPOUR N.. A FUZZY MIXED-INTEGER GOAL PROGRAMMING MODEL FOR A PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND RELEASE DATES. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL[Internet]. 2008;4(7):38-47. Available from: https://sid.ir/paper/309781/en

    IEEE: Copy

    A.H. GHARAHGOUZLI, R. TAVAKOLI MOGHADAM, M. RABANI, and N. ZAERPOUR, “A FUZZY MIXED-INTEGER GOAL PROGRAMMING MODEL FOR A PARALLEL MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP TIMES AND RELEASE DATES,” JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, vol. 4, no. 7, pp. 38–47, 2008, [Online]. Available: https://sid.ir/paper/309781/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button