مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

245
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

91
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A METHODOLOGY TO ESTIMATE ORES WORK INDEX VALUES, USING MIDUK COPPER MINE SAMPLE

Pages

  27-34

Abstract

 It is always attempted to reduce the costs of comminution in mineral processing plants. One of the difficulties in size reduction section is not to be designed properly. The key factor to design size reduction units such as crushers and grinding mills, is ore’s WORK INDEX. The WORK INDEX, wi, presents the ore grindability, and is used in Bond formula to calculate the required energy. Bond has defined a specific relationship between some parameters which is applied to calculate wi, which are CONTROL SCREEN, fine particles produced, feed and product d80.In this research work, a high grade copper sample from MIDUK COPPER concentrator was prepared, and its WORK INDEX values were experimentally estimated, using different CONTROL SCREENs, 600, 425, 212, 150, 106 and 75 microns. The obtained results from the tests showed two different behaviors in fine production. According to these two trends the required models were then defined to present the fine mass calculation using CONTROL SCREEN. In next step, an equation was presented in order to calculate MIDUK COPPER ore WORK INDEX for any size. In addition to verify the model creditability, a test using 300 microns CONTROL SCREEN was performed and its result was compared with calculated ones using defined model, which showed a good fit. Finally the experimental and calculated values were compared and their relative error was equal to 4.11% which is an indication of good fit for the results.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    NOAPARAST, M., RAHMATI, S., JOZANIKOHAN, G., ASLANI, S., & GHORBANI, A.. (2012). A METHODOLOGY TO ESTIMATE ORES WORK INDEX VALUES, USING MIDUK COPPER MINE SAMPLE. INTERNATIONAL JOURNAL OF MINING AND GEO-ENGINEERING, 46(1), 27-34. SID. https://sid.ir/paper/329939/en

    Vancouver: Copy

    NOAPARAST M., RAHMATI S., JOZANIKOHAN G., ASLANI S., GHORBANI A.. A METHODOLOGY TO ESTIMATE ORES WORK INDEX VALUES, USING MIDUK COPPER MINE SAMPLE. INTERNATIONAL JOURNAL OF MINING AND GEO-ENGINEERING[Internet]. 2012;46(1):27-34. Available from: https://sid.ir/paper/329939/en

    IEEE: Copy

    M. NOAPARAST, S. RAHMATI, G. JOZANIKOHAN, S. ASLANI, and A. GHORBANI, “A METHODOLOGY TO ESTIMATE ORES WORK INDEX VALUES, USING MIDUK COPPER MINE SAMPLE,” INTERNATIONAL JOURNAL OF MINING AND GEO-ENGINEERING, vol. 46, no. 1, pp. 27–34, 2012, [Online]. Available: https://sid.ir/paper/329939/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button