Information Journal Paper
APA:
CopySEYFI, M., & TAVAKOLI MOGHADAM, R.. (2008). A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS. INTERNATIONAL JOURNAL OF ENGINEERING, 21(4 (TRANSACTIONS A: BASICS)), 347-360. SID. https://sid.ir/paper/355706/en
Vancouver:
CopySEYFI M., TAVAKOLI MOGHADAM R.. A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2008;21(4 (TRANSACTIONS A: BASICS)):347-360. Available from: https://sid.ir/paper/355706/en
IEEE:
CopyM. SEYFI, and R. TAVAKOLI MOGHADAM, “A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 21, no. 4 (TRANSACTIONS A: BASICS), pp. 347–360, 2008, [Online]. Available: https://sid.ir/paper/355706/en