مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

703
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

262
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS

Pages

  347-360

Abstract

 The aim of a multi-mode resource-constrained PROJECT SCHEDULING problem (MRCPSP) is to assign resource (s) with the restricted capacity to an EXECUTION MODE of activities by considering relationship constraints, to achieve pre-determined objective (s). These goals vary with managers or decision makers of any organization who should determine suitable objective (s) considering organization strategies. In this paper, we present a new bi-objective model for the MRCPSP that maximizes the NET PRESENT VALUE (NPV) and minimizes the holding cost of activities completed by the projects’ completion time. For better adoption with real conditions, we consider four different PAYMENT MODELs for positive cash flow. To verify the proposed model, a number of numerical examples are solved in small sizes and the related computational results are illustrated in terms of schedules. Finally, a meta-heuristic algorithm based on simulated annealing (SA) is utilized to solve our four payment proposed models in various sizes and the obtained results were analyzed.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SEYFI, M., & TAVAKOLI MOGHADAM, R.. (2008). A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS. INTERNATIONAL JOURNAL OF ENGINEERING, 21(4 (TRANSACTIONS A: BASICS)), 347-360. SID. https://sid.ir/paper/355706/en

    Vancouver: Copy

    SEYFI M., TAVAKOLI MOGHADAM R.. A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2008;21(4 (TRANSACTIONS A: BASICS)):347-360. Available from: https://sid.ir/paper/355706/en

    IEEE: Copy

    M. SEYFI, and R. TAVAKOLI MOGHADAM, “A NEW BI-OBJECTIVE MODEL FOR A MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM WITH DISCOUNTED CASH FLOWS AND FOUR PAYMENT MODELS,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 21, no. 4 (TRANSACTIONS A: BASICS), pp. 347–360, 2008, [Online]. Available: https://sid.ir/paper/355706/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button