مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

256
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost

Pages

  215-232

Abstract

 One of the major issues in construction Project Management is selection of the best alternative for execution of each activity, so that the project progresses with the lowest possible total cost and total time. In the real world, different sources of uncertainty usually adversely affect on activity duration and activity cost. Therefore, it is important to present methods for robust construction project scheduling that are less sensitive to disruptions caused by noise factors. In addition, existing approaches in literature seldom focus on environmentally conscious construction planning. However, obtaining of this aim requires to consider multiple objectives and their relationships, simultaneously. In this study, a roust optimization based method for solving discrete time-cost-enviroment trade-off problem is presented, in which time and cost of activities as uncertain factors are considered. To investigate the performance of the suggested approach, a computational analysis on construction project of protective wall of the east coast of port in the economic zone of Amirabad is performed. the obtained results indicate that the robust model has beter performance in comparison with the corresponding deterministic model.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Heydarnezhad, Elahe, SALMASNIA, ALI, & BARADARAN KAZEMZADEH, REZA. (2019). Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost. JOURNAL OF MODELING IN ENGINEERING, 17(58 ), 215-232. SID. https://sid.ir/paper/388013/en

    Vancouver: Copy

    Heydarnezhad Elahe, SALMASNIA ALI, BARADARAN KAZEMZADEH REZA. Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost. JOURNAL OF MODELING IN ENGINEERING[Internet]. 2019;17(58 ):215-232. Available from: https://sid.ir/paper/388013/en

    IEEE: Copy

    Elahe Heydarnezhad, ALI SALMASNIA, and REZA BARADARAN KAZEMZADEH, “Robust optimization of a discrete time-cost-environment trade-off problem by considering uncertainty in time and cost,” JOURNAL OF MODELING IN ENGINEERING, vol. 17, no. 58 , pp. 215–232, 2019, [Online]. Available: https://sid.ir/paper/388013/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button