مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

404
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Mathematical modeling of activities scheduling with regard to overtime costs and delay penalties: A case study in mining Sector

Pages

  315-323

Abstract

sequencing and timing of project activities with limited resources is one of the important issues related to the field of project management that With proper management can reduce the high costs of projects. One of the projects that could be mentioned, Extraction project of a block of Choghart iron ore mining is located in Yazd province that with accurate identification of its activities, WBS charts and AOA with prerequisite relationships between the activities and resources required are derived. Mathematical model of a particular issue with the aim to minimize overtime costs and delays in project delivery, has been developed. Mathematical model implemented by the GAMS. 9 software and results of activities optimization sequencing and scheduling is estimated. The results show that the optimal number 5 sources there is in order to extract a block of Choghart iron ore mine.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    Bakhshandeh Amnie, Hasan, MOKHTARI, HADI, Hakimian, Meysam, & Dehnavi Arani, Saeed. (2018). Mathematical modeling of activities scheduling with regard to overtime costs and delay penalties: A case study in mining Sector. JOURNAL OF MODELING IN ENGINEERING, 16(53 ), 315-323. SID. https://sid.ir/paper/395280/en

    Vancouver: Copy

    Bakhshandeh Amnie Hasan, MOKHTARI HADI, Hakimian Meysam, Dehnavi Arani Saeed. Mathematical modeling of activities scheduling with regard to overtime costs and delay penalties: A case study in mining Sector. JOURNAL OF MODELING IN ENGINEERING[Internet]. 2018;16(53 ):315-323. Available from: https://sid.ir/paper/395280/en

    IEEE: Copy

    Hasan Bakhshandeh Amnie, HADI MOKHTARI, Meysam Hakimian, and Saeed Dehnavi Arani, “Mathematical modeling of activities scheduling with regard to overtime costs and delay penalties: A case study in mining Sector,” JOURNAL OF MODELING IN ENGINEERING, vol. 16, no. 53 , pp. 315–323, 2018, [Online]. Available: https://sid.ir/paper/395280/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button