مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

973
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Presentation of Exact and Metaheurestic Solution Method for Minimization Project Completion Time with Considering Budget Constraint Problem

Pages

  41-56

Abstract

 Project planning and scheduling are one of the most important issues in construction engineering and management. It is being crucial to progress developed countries. One of the major challenges in construction Project management is Time and Cost management. The traditional view lonely is not able to meet the needs of this field. Therefore, the use of modern management approaches can be greatly helpful. Time and cost are among the important objectives of each project. Cost and time trade-off is among the major important issues in projects planning and control and the main of solving this problem is actually analysis of interaction of different types of project costs and time of the project. In this paper, a time and cost trade off project scheduling problem under Budget constraint is studied. For this purpose, a meta-heuristic genetic algorithm is developed to find the optimal solution in MATLAB. Completion time sensitivity analysis is done according to different budget level. In order to validate proposed algorithm, problem is solved by GAMS and the outputs between them are compared. The results show that proposed meta heuristic algorithm is able to solve problem optimally so that differences between samples solution were zero in different budget level. In addition, by providing some other examples of small, medium and large dimensions, the ability to solve problems accurately and the accuracy of the proposed genetic algorithm was examined. The output obtained showed that the solution was the same in two methods in small dimensions. Also, it is not possible to solve the exact problems in large dimensions and can only be solved using the proposed meta heuristic algorithm.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    MAHDAVI, IRAJ, Hematian, Milad, TAHERI AMIRI, MOHAMMAD JAVAD, & Ghenaat, Omid. (2019). Presentation of Exact and Metaheurestic Solution Method for Minimization Project Completion Time with Considering Budget Constraint Problem. JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING, 6(3 (26) ), 41-56. SID. https://sid.ir/paper/409592/en

    Vancouver: Copy

    MAHDAVI IRAJ, Hematian Milad, TAHERI AMIRI MOHAMMAD JAVAD, Ghenaat Omid. Presentation of Exact and Metaheurestic Solution Method for Minimization Project Completion Time with Considering Budget Constraint Problem. JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING[Internet]. 2019;6(3 (26) ):41-56. Available from: https://sid.ir/paper/409592/en

    IEEE: Copy

    IRAJ MAHDAVI, Milad Hematian, MOHAMMAD JAVAD TAHERI AMIRI, and Omid Ghenaat, “Presentation of Exact and Metaheurestic Solution Method for Minimization Project Completion Time with Considering Budget Constraint Problem,” JOURNAL OF STRUCTURAL AND CONSTRUCTION ENGINEERING, vol. 6, no. 3 (26) , pp. 41–56, 2019, [Online]. Available: https://sid.ir/paper/409592/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top