مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

359
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Management and Assessment of Tunnel Construction Projects risks Using Combinatorial Method of the VIKOR and Analytical Hierarchy process

Pages

  39-57

Abstract

 The project management involves time management, cost, quality and Risk of the project. Each project has time constraints, cost and quality. Since each of these constraints have a potential for Risk, therefore, project Risk management is essential. Increasing the cost and expanding the scale of projects on the one hand and increasing the uncertainty and Risk of projects on the other hand has made Risk management and assessment important. The purpose of Risk management and assessment is to identify and evaluate accidental events that can have a positive or negative impact on project goals. In this study, a hybrid model for managing and evaluating the Risks associated with tunneling operations using Multiple-criteria Decision making methods is presented. After identifying the Risks and performing the Delphi process, Risk Breakdown Structure (RBS) was used to categorize the Risks, Analytical Hierarchy process (AHP) has been used for Risk weighting, and VIKOR multiple-criteria Decision making has been used to determine the Risk ratings. The results showed that among the Risks, the Risk of manpower, Economic Risk and management Risk were classified as critical Risks.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SHAHRAKI, MOHAMMAD REZA, & Vahedi Nezhad, Neda. (2021). Management and Assessment of Tunnel Construction Projects risks Using Combinatorial Method of the VIKOR and Analytical Hierarchy process. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), 16(50 ), 39-57. SID. https://sid.ir/paper/413586/en

    Vancouver: Copy

    SHAHRAKI MOHAMMAD REZA, Vahedi Nezhad Neda. Management and Assessment of Tunnel Construction Projects risks Using Combinatorial Method of the VIKOR and Analytical Hierarchy process. IRANIAN JOURNAL OF MINING ENGINEERING (IRJME)[Internet]. 2021;16(50 ):39-57. Available from: https://sid.ir/paper/413586/en

    IEEE: Copy

    MOHAMMAD REZA SHAHRAKI, and Neda Vahedi Nezhad, “Management and Assessment of Tunnel Construction Projects risks Using Combinatorial Method of the VIKOR and Analytical Hierarchy process,” IRANIAN JOURNAL OF MINING ENGINEERING (IRJME), vol. 16, no. 50 , pp. 39–57, 2021, [Online]. Available: https://sid.ir/paper/413586/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button