Information Journal Paper
APA:
CopyNADERI, BAHMAN, ZANDIEH, MOSTAFA, & FATEMI GHOMI, SEYED MOHAMMAD TAGHI. (2009). AN ITERATED GREEDY ALGORITHM FOR FLEXIBLE FLOW LINES WITH SEQUENCE DEPENDENT SETUP TIMES TO MINIMIZE TOTAL WEIGHTED COMPLETION TIME. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 3(PRE. NO. 3), 33-37. SID. https://sid.ir/paper/574893/en
Vancouver:
CopyNADERI BAHMAN, ZANDIEH MOSTAFA, FATEMI GHOMI SEYED MOHAMMAD TAGHI. AN ITERATED GREEDY ALGORITHM FOR FLEXIBLE FLOW LINES WITH SEQUENCE DEPENDENT SETUP TIMES TO MINIMIZE TOTAL WEIGHTED COMPLETION TIME. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2009;3(PRE. NO. 3):33-37. Available from: https://sid.ir/paper/574893/en
IEEE:
CopyBAHMAN NADERI, MOSTAFA ZANDIEH, and SEYED MOHAMMAD TAGHI FATEMI GHOMI, “AN ITERATED GREEDY ALGORITHM FOR FLEXIBLE FLOW LINES WITH SEQUENCE DEPENDENT SETUP TIMES TO MINIMIZE TOTAL WEIGHTED COMPLETION TIME,” JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 3, no. PRE. NO. 3, pp. 33–37, 2009, [Online]. Available: https://sid.ir/paper/574893/en