Information Journal Paper
APA:
CopyPISHBIN, S., MOHAMMADI, HAMID, & ZAKERIN, A.A.R.. (2009). DETERMINATION OF TIMELINESS COST OF MACHINE OPERATION IN DIFFERENT STAGES OF SUGAR BEET PRODUCTION IN FARS PROVINCE. JOURNAL OF SUGAR BEET, 24(2), 93-108. SID. https://sid.ir/paper/57529/en
Vancouver:
CopyPISHBIN S., MOHAMMADI HAMID, ZAKERIN A.A.R.. DETERMINATION OF TIMELINESS COST OF MACHINE OPERATION IN DIFFERENT STAGES OF SUGAR BEET PRODUCTION IN FARS PROVINCE. JOURNAL OF SUGAR BEET[Internet]. 2009;24(2):93-108. Available from: https://sid.ir/paper/57529/en
IEEE:
CopyS. PISHBIN, HAMID MOHAMMADI, and A.A.R. ZAKERIN, “DETERMINATION OF TIMELINESS COST OF MACHINE OPERATION IN DIFFERENT STAGES OF SUGAR BEET PRODUCTION IN FARS PROVINCE,” JOURNAL OF SUGAR BEET, vol. 24, no. 2, pp. 93–108, 2009, [Online]. Available: https://sid.ir/paper/57529/en