مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

332
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

142
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

BUILDING A MULTI-OBJECTIVE MODEL FOR MULTI-PRODUCT MULTI-PERIOD PRODUCTION PLANNING WITH CONTROLLABLE PROCESSING TIMES: A REAL CASE PROBLEM

Author(s)

ARYANEZHAD MIR BAHADORGHOLI | KARIMI NASAB MEHDI | FATEMI GHOMI SEYED MOHAMMAD TAGHI | Issue Writer Certificate 

Pages

  1-11

Abstract

 Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient model for a real case PRODUCTION PLANNING problem. This process is reinforced by providing the proofs confirming the special characteristics of the final model such as proving its NP-Completeness. Also, the extremes of both objective functions – production smoothing versus cost minimizing – are calculated analytically. Finally, the case study and its solution methods are discussed briefly.

Cites

  • No record.
  • References

    Cite

    APA: Copy

    ARYANEZHAD, MIR BAHADORGHOLI, KARIMI NASAB, MEHDI, & FATEMI GHOMI, SEYED MOHAMMAD TAGHI. (2009). BUILDING A MULTI-OBJECTIVE MODEL FOR MULTI-PRODUCT MULTI-PERIOD PRODUCTION PLANNING WITH CONTROLLABLE PROCESSING TIMES: A REAL CASE PROBLEM. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 4(PRE. NO. 4), 1-11. SID. https://sid.ir/paper/584710/en

    Vancouver: Copy

    ARYANEZHAD MIR BAHADORGHOLI, KARIMI NASAB MEHDI, FATEMI GHOMI SEYED MOHAMMAD TAGHI. BUILDING A MULTI-OBJECTIVE MODEL FOR MULTI-PRODUCT MULTI-PERIOD PRODUCTION PLANNING WITH CONTROLLABLE PROCESSING TIMES: A REAL CASE PROBLEM. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2009;4(PRE. NO. 4):1-11. Available from: https://sid.ir/paper/584710/en

    IEEE: Copy

    MIR BAHADORGHOLI ARYANEZHAD, MEHDI KARIMI NASAB, and SEYED MOHAMMAD TAGHI FATEMI GHOMI, “BUILDING A MULTI-OBJECTIVE MODEL FOR MULTI-PRODUCT MULTI-PERIOD PRODUCTION PLANNING WITH CONTROLLABLE PROCESSING TIMES: A REAL CASE PROBLEM,” JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 4, no. PRE. NO. 4, pp. 1–11, 2009, [Online]. Available: https://sid.ir/paper/584710/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button