Information Journal Paper
APA:
CopyRAZMI, JAFAR, & OSTADI, BAKHTIAR. (2009). DYNAMIC CARGO TRAINS SCHEDULING FOR TACKLING NETWORK CONSTRAINTS AND COSTS EMANATING FROM TARDINESS AND EARLINESS. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 4(PRE. NO. 4), 19-27. SID. https://sid.ir/paper/584989/en
Vancouver:
CopyRAZMI JAFAR, OSTADI BAKHTIAR. DYNAMIC CARGO TRAINS SCHEDULING FOR TACKLING NETWORK CONSTRAINTS AND COSTS EMANATING FROM TARDINESS AND EARLINESS. JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2009;4(PRE. NO. 4):19-27. Available from: https://sid.ir/paper/584989/en
IEEE:
CopyJAFAR RAZMI, and BAKHTIAR OSTADI, “DYNAMIC CARGO TRAINS SCHEDULING FOR TACKLING NETWORK CONSTRAINTS AND COSTS EMANATING FROM TARDINESS AND EARLINESS,” JOURNAL OF OPTIMIZATION IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 4, no. PRE. NO. 4, pp. 19–27, 2009, [Online]. Available: https://sid.ir/paper/584989/en