مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

580
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

235
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

QUANTITATIVE RISK ALLOCATION IN CONSTRUCTION PROJECTS: A FUZZY-BARGAINING GAME APPROACH

Pages

  83-94

Abstract

 The quantitative approaches to risk allocation, determine how much of a risk is borne by each party. An equitable risk allocation between the contracting parties plays a vital role in enhancing the performance of the project. This research presents a new QUANTITATIVE RISK ALLOCATION approach integrating FUZZY LOGIC and BARGAINING GAME THEORY. Owing to the imprecise and uncertain nature of the costs imposed to the contracting parties at different percentages of risk allocation, FUZZY LOGIC is employed to determine the value of players payoffs based on the opinion and subjective judgment of experts involved in the project. Having determined the value of players payoffs, BARGAINING GAME THEORY is then applied to find the equitable risk allocation between the client and the contractor. Four different methods including symmetric Nash, non-symmetric Nash, non-symmetric Kalai–Smorodinsky and non-symmetric area monotonic are finally implemented to determine the equitable risk allocation. To evaluate the performance of the proposed model, it is implemented in a pipeline project and the QUANTITATIVE RISK ALLOCATION is performed for the inflation as one of the most significant identified risks.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    ROUHPARVAR, MEHDI, MAZANDARANI ZADEH, HAMED, & NASIRZADEH, FARNAD. (2014). QUANTITATIVE RISK ALLOCATION IN CONSTRUCTION PROJECTS: A FUZZY-BARGAINING GAME APPROACH. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), 25(2), 83-94. SID. https://sid.ir/paper/639002/en

    Vancouver: Copy

    ROUHPARVAR MEHDI, MAZANDARANI ZADEH HAMED, NASIRZADEH FARNAD. QUANTITATIVE RISK ALLOCATION IN CONSTRUCTION PROJECTS: A FUZZY-BARGAINING GAME APPROACH. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH)[Internet]. 2014;25(2):83-94. Available from: https://sid.ir/paper/639002/en

    IEEE: Copy

    MEHDI ROUHPARVAR, HAMED MAZANDARANI ZADEH, and FARNAD NASIRZADEH, “QUANTITATIVE RISK ALLOCATION IN CONSTRUCTION PROJECTS: A FUZZY-BARGAINING GAME APPROACH,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), vol. 25, no. 2, pp. 83–94, 2014, [Online]. Available: https://sid.ir/paper/639002/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button