Information Journal Paper
APA:
CopyEBRAHIMNEZHAD, S.A., TAVAKOLI MOGHADAM, R., HATAMI, SARA, & MABOUDIAN, Y.. (2010). AN ASSEMBLY FLOW-SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP AND TRANSPORTATION TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 21(1), 15-23. SID. https://sid.ir/paper/65392/en
Vancouver:
CopyEBRAHIMNEZHAD S.A., TAVAKOLI MOGHADAM R., HATAMI SARA, MABOUDIAN Y.. AN ASSEMBLY FLOW-SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP AND TRANSPORTATION TIMES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2010;21(1):15-23. Available from: https://sid.ir/paper/65392/en
IEEE:
CopyS.A. EBRAHIMNEZHAD, R. TAVAKOLI MOGHADAM, SARA HATAMI, and Y. MABOUDIAN, “AN ASSEMBLY FLOW-SHOP SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SETUP AND TRANSPORTATION TIMES,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 21, no. 1, pp. 15–23, 2010, [Online]. Available: https://sid.ir/paper/65392/en