Information Journal Paper
APA:
CopyNOOROSSANA, RASSOUL, PEYNABAR, KAMRAN, & MORADIMANESH, MONA. (2012). ESTIMATING TIME OF A SIMPLE STEP CHANGE IN NON-CONFORMING ITEMS IN HIGH-YIELD PROCESSES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 22(4), 320-330. SID. https://sid.ir/paper/65472/en
Vancouver:
CopyNOOROSSANA RASSOUL, PEYNABAR KAMRAN, MORADIMANESH MONA. ESTIMATING TIME OF A SIMPLE STEP CHANGE IN NON-CONFORMING ITEMS IN HIGH-YIELD PROCESSES. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2012;22(4):320-330. Available from: https://sid.ir/paper/65472/en
IEEE:
CopyRASSOUL NOOROSSANA, KAMRAN PEYNABAR, and MONA MORADIMANESH, “ESTIMATING TIME OF A SIMPLE STEP CHANGE IN NON-CONFORMING ITEMS IN HIGH-YIELD PROCESSES,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 22, no. 4, pp. 320–330, 2012, [Online]. Available: https://sid.ir/paper/65472/en