Information Journal Paper
APA:
CopyASGHARPOUR, M.J., & KARIMI GAVARESHKI, M.H.. (2004). A NEW TECHNIQUE IN FUZZY GERT FORRESEARCH PROJECTS SCHEDULING. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 15(1), 113-131. SID. https://sid.ir/paper/65788/en
Vancouver:
CopyASGHARPOUR M.J., KARIMI GAVARESHKI M.H.. A NEW TECHNIQUE IN FUZZY GERT FORRESEARCH PROJECTS SCHEDULING. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2004;15(1):113-131. Available from: https://sid.ir/paper/65788/en
IEEE:
CopyM.J. ASGHARPOUR, and M.H. KARIMI GAVARESHKI, “A NEW TECHNIQUE IN FUZZY GERT FORRESEARCH PROJECTS SCHEDULING,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 15, no. 1, pp. 113–131, 2004, [Online]. Available: https://sid.ir/paper/65788/en