Information Journal Paper
APA:
CopyNOORI, SIAMAK, & YAGHOUBI, SAEED. (2013). CALCULATING THE MEAN PROJECT COMPLETION TIME IN DYNAMIC PERT NETWORKS (MULTI-PROJECT SYSTEM) WITH FINITE CAPACITY. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 24(3), 350-360. SID. https://sid.ir/paper/65922/en
Vancouver:
CopyNOORI SIAMAK, YAGHOUBI SAEED. CALCULATING THE MEAN PROJECT COMPLETION TIME IN DYNAMIC PERT NETWORKS (MULTI-PROJECT SYSTEM) WITH FINITE CAPACITY. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2013;24(3):350-360. Available from: https://sid.ir/paper/65922/en
IEEE:
CopySIAMAK NOORI, and SAEED YAGHOUBI, “CALCULATING THE MEAN PROJECT COMPLETION TIME IN DYNAMIC PERT NETWORKS (MULTI-PROJECT SYSTEM) WITH FINITE CAPACITY,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 24, no. 3, pp. 350–360, 2013, [Online]. Available: https://sid.ir/paper/65922/en