Information Journal Paper
APA:
CopySHOKOUHI, A.H., & SHAHRIARI, HAMID. (2010). A ROBUST MULTI-OBJECTIVE LEAD TIME CONTROL PROBLEM IN COMPLEX ASSEMBLY SYSTEMS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 21(2), 23-35. SID. https://sid.ir/paper/65963/en
Vancouver:
CopySHOKOUHI A.H., SHAHRIARI HAMID. A ROBUST MULTI-OBJECTIVE LEAD TIME CONTROL PROBLEM IN COMPLEX ASSEMBLY SYSTEMS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2010;21(2):23-35. Available from: https://sid.ir/paper/65963/en
IEEE:
CopyA.H. SHOKOUHI, and HAMID SHAHRIARI, “A ROBUST MULTI-OBJECTIVE LEAD TIME CONTROL PROBLEM IN COMPLEX ASSEMBLY SYSTEMS,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 21, no. 2, pp. 23–35, 2010, [Online]. Available: https://sid.ir/paper/65963/en