مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

671
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

A ROBUST MULTI-OBJECTIVE LEAD TIME CONTROL PROBLEM IN COMPLEX ASSEMBLY SYSTEMS

Pages

  23-35

Abstract

 In this paper, a robust multi-objective model to optimally control the LEAD TIME of a complex assembly system is introduced. The system is modeled as an open queue network, whose service stations represent manufacturing or assembly operations. It is assumed that the products arrive independently according to a Poisson process. In each service station, there is either one or infinite number of servers with exponentially distributed processing time. Each service station produces uncertain but limited number of scraps which are independent from the other service stations. The transport times between the service stations are independent random variables with generalized Erlang distribution. Addressing the data uncertainty, the problem is formulated as a robust multi-objective optimal control problem that involves three types of conflicting objective functions. The types of objective functions are the total operating costs of the system per period, the average LEAD TIME and the variance of the LEAD TIME. Finally, we use the goal attainment method to solve a discretetime approximation of the original problem to obtain the optimal service rates of the problem.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    SHOKOUHI, A.H., & SHAHRIARI, HAMID. (2010). A ROBUST MULTI-OBJECTIVE LEAD TIME CONTROL PROBLEM IN COMPLEX ASSEMBLY SYSTEMS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), 21(2), 23-35. SID. https://sid.ir/paper/65963/en

    Vancouver: Copy

    SHOKOUHI A.H., SHAHRIARI HAMID. A ROBUST MULTI-OBJECTIVE LEAD TIME CONTROL PROBLEM IN COMPLEX ASSEMBLY SYSTEMS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN)[Internet]. 2010;21(2):23-35. Available from: https://sid.ir/paper/65963/en

    IEEE: Copy

    A.H. SHOKOUHI, and HAMID SHAHRIARI, “A ROBUST MULTI-OBJECTIVE LEAD TIME CONTROL PROBLEM IN COMPLEX ASSEMBLY SYSTEMS,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT (IJIE) (INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE) (PERSIAN), vol. 21, no. 2, pp. 23–35, 2010, [Online]. Available: https://sid.ir/paper/65963/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button