مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

281
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

557
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

PROJECT TIME AND COST FORECASTING USING MONTE CARLO SIMULATION AND ARTIFICIAL NEURAL NETWORKS

Pages

  231-239

Abstract

 The aim of this study is to present a new method to predict project time and cost under uncertainty. Assuming that what happens in projects implementation which is expressed in the form of EARNED VALUE MANAGEMENT (EVM) indicators is primarily related to the nature of randomness or unreliability, in this study, by using MONTE CARLO SIMULATION and assuming a specific distribution for the time and cost of project activities, a significant number of predicting scenarios will be simulated. According to the data, an ARTIFICIAL NEURAL NETWORK is used as an efficient data mining method to estimate the project time and cost at completion.

Multimedia

  • No record.
  • Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    AKHBARI, MAHDIEH. (2018). PROJECT TIME AND COST FORECASTING USING MONTE CARLO SIMULATION AND ARTIFICIAL NEURAL NETWORKS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), 29(2), 231-239. SID. https://sid.ir/paper/706601/en

    Vancouver: Copy

    AKHBARI MAHDIEH. PROJECT TIME AND COST FORECASTING USING MONTE CARLO SIMULATION AND ARTIFICIAL NEURAL NETWORKS. INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH)[Internet]. 2018;29(2):231-239. Available from: https://sid.ir/paper/706601/en

    IEEE: Copy

    MAHDIEH AKHBARI, “PROJECT TIME AND COST FORECASTING USING MONTE CARLO SIMULATION AND ARTIFICIAL NEURAL NETWORKS,” INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING AND PRODUCTION RESEARCH (IJIE) (ENGLISH), vol. 29, no. 2, pp. 231–239, 2018, [Online]. Available: https://sid.ir/paper/706601/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button