مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

156
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

66
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources

Pages

  780-791

Abstract

 Project success is assessed based on various criteria, every one of which enjoys a different level of importance from the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for assessing project success. On the other hand, reducing the risk of finishing activities by the predetermined deadlines should be taken into account. Having formulated the problem as a multi-objective planning one, the present study aims to minimize the project completion time as well as maximizing the net present value and Project Flexibility by taking into accounts the resource constraints and precedence relations. Here, the flexibility of the project is calculated by considering a free float for each activity and maximizing the sum of these flotation times. Moreover, the performance of each activity may be possible in various states of using resources (mode) which can change the project completion time and cost. Owing to the complexity of the problem, the Multi Objective Simulated Annealing Meta-Heuristic Algorithm is used to solve the proposed model. For accrediting the Algorithm, four benchmark problems were considered. Since the Algorithm performed well in finding the optimal answers to the benchmark problems, it was used to find the optimal answer of large scale problems.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    FARUGHI, H., AMIRI, A., & ABDI, F.. (2018). Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources. INTERNATIONAL JOURNAL OF ENGINEERING, 31(5 (TRANSACTIONS B: Applications)), 780-791. SID. https://sid.ir/paper/730352/en

    Vancouver: Copy

    FARUGHI H., AMIRI A., ABDI F.. Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2018;31(5 (TRANSACTIONS B: Applications)):780-791. Available from: https://sid.ir/paper/730352/en

    IEEE: Copy

    H. FARUGHI, A. AMIRI, and F. ABDI, “Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 31, no. 5 (TRANSACTIONS B: Applications), pp. 780–791, 2018, [Online]. Available: https://sid.ir/paper/730352/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button