Information Journal Paper
APA:
CopyNouri Koupaei, m., MOHAMMADI, M., & NADERI, B.. (2017). A Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties. INTERNATIONAL JOURNAL OF ENGINEERING, 30(5 (TRANSACTIONS B: Applications)), 749-757. SID. https://sid.ir/paper/734866/en
Vancouver:
CopyNouri Koupaei m., MOHAMMADI M., NADERI B.. A Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties. INTERNATIONAL JOURNAL OF ENGINEERING[Internet]. 2017;30(5 (TRANSACTIONS B: Applications)):749-757. Available from: https://sid.ir/paper/734866/en
IEEE:
Copym. Nouri Koupaei, M. MOHAMMADI, and B. NADERI, “A Scheduling Model of Flexible Manufacturing System to Reduce Waste and Earliness/Tardiness Penalties,” INTERNATIONAL JOURNAL OF ENGINEERING, vol. 30, no. 5 (TRANSACTIONS B: Applications), pp. 749–757, 2017, [Online]. Available: https://sid.ir/paper/734866/en