مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

199
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

209
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Automatic under Voltage Load Shedding and Automatic Switching of Bus Reactors for Mitigating Fault Induced Delayed Voltage Recovery

Pages

  171-177

Abstract

 This paper presents the application of automatic under voltage load tripping and switching of shunt reactors as counter measures for Fault Induced Delayed Voltage Recovery (FIDVR). As dynamic behavior of loads has significant impact on simulating FIDVR, proper load modeling is also discussed in this paper. Simulations conducted on actual network show that the proposed load model is effectively able to simulate FIDVR. It also shown that automatic Under Voltage Load Shedding and switching of shunt reactors can be used as counter measures for reducing risk of voltage collapse or over voltage conditions that may take place following load tripping caused by FIDVR.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    RASHIDI, FARZAN, & Feshki Farahani, Hassan. (2017). Automatic under Voltage Load Shedding and Automatic Switching of Bus Reactors for Mitigating Fault Induced Delayed Voltage Recovery. ELECTRONIC INDUSTRIES, 8(2 ), 171-177. SID. https://sid.ir/paper/739544/en

    Vancouver: Copy

    RASHIDI FARZAN, Feshki Farahani Hassan. Automatic under Voltage Load Shedding and Automatic Switching of Bus Reactors for Mitigating Fault Induced Delayed Voltage Recovery. ELECTRONIC INDUSTRIES[Internet]. 2017;8(2 ):171-177. Available from: https://sid.ir/paper/739544/en

    IEEE: Copy

    FARZAN RASHIDI, and Hassan Feshki Farahani, “Automatic under Voltage Load Shedding and Automatic Switching of Bus Reactors for Mitigating Fault Induced Delayed Voltage Recovery,” ELECTRONIC INDUSTRIES, vol. 8, no. 2 , pp. 171–177, 2017, [Online]. Available: https://sid.ir/paper/739544/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button