Information Journal Paper
APA:
CopyKHANZADI, M., AFANDIZADEH, SH., & ABRISHMACHI, I.. (2011). PREDICTION OF HIGHWAY CONSTRUCTION DELAY DUE TO WEATHER IMPACT USING FUZZY-PROBABILISTIC RISK ANALYSIS. JOURNAL OF TRANSPORTATION RESEARCH, 8(3 (28)), 211-224. SID. https://sid.ir/paper/83808/en
Vancouver:
CopyKHANZADI M., AFANDIZADEH SH., ABRISHMACHI I.. PREDICTION OF HIGHWAY CONSTRUCTION DELAY DUE TO WEATHER IMPACT USING FUZZY-PROBABILISTIC RISK ANALYSIS. JOURNAL OF TRANSPORTATION RESEARCH[Internet]. 2011;8(3 (28)):211-224. Available from: https://sid.ir/paper/83808/en
IEEE:
CopyM. KHANZADI, SH. AFANDIZADEH, and I. ABRISHMACHI, “PREDICTION OF HIGHWAY CONSTRUCTION DELAY DUE TO WEATHER IMPACT USING FUZZY-PROBABILISTIC RISK ANALYSIS,” JOURNAL OF TRANSPORTATION RESEARCH, vol. 8, no. 3 (28), pp. 211–224, 2011, [Online]. Available: https://sid.ir/paper/83808/en