مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

2,191
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

PREDICTION OF HIGHWAY CONSTRUCTION DELAY DUE TO WEATHER IMPACT USING FUZZY-PROBABILISTIC RISK ANALYSIS

Pages

  211-224

Abstract

HIGHWAY CONSTRUCTION projects are conducted in an outdoor environment, and are therefore sensitive to various WEATHER CONDITIONs, especially rainfall. Rainfall is regarded as a major risk factor, which often leads to partial or complete suspension of construction project operations. In this paper, a decision support system is developed for quantifying the impact of rainfall and temperature on HIGHWAY CONSTRUCTION schedules. The system incorporates a database that uses historical daily rainfall and temperature data alongside a knowledgebase that includes a FUZZY INFERENCE SYSTEM, employing fuzzy rules acquired from experts in HIGHWAY CONSTRUCTION. As the monthly DELAYs are random variables, probability theory is also applied for frequency analysis. This system can be useful in preparing realistic schedules for the preconstruction stage and in analyzing weather-related claims for the post construction stage. It can also be used in predicting the impact of short term weather forecasts in the real- time construction process. To demonstrate the usefulness of the system, it has been applied to the cities of Tehran and Gorgan in Iran, which have very different climates, and the results are compared and discussed. The results show how the differences in climate of these cities and the time and stage of construction are reflected in predicted construction DELAYs.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    KHANZADI, M., AFANDIZADEH, SH., & ABRISHMACHI, I.. (2011). PREDICTION OF HIGHWAY CONSTRUCTION DELAY DUE TO WEATHER IMPACT USING FUZZY-PROBABILISTIC RISK ANALYSIS. JOURNAL OF TRANSPORTATION RESEARCH, 8(3 (28)), 211-224. SID. https://sid.ir/paper/83808/en

    Vancouver: Copy

    KHANZADI M., AFANDIZADEH SH., ABRISHMACHI I.. PREDICTION OF HIGHWAY CONSTRUCTION DELAY DUE TO WEATHER IMPACT USING FUZZY-PROBABILISTIC RISK ANALYSIS. JOURNAL OF TRANSPORTATION RESEARCH[Internet]. 2011;8(3 (28)):211-224. Available from: https://sid.ir/paper/83808/en

    IEEE: Copy

    M. KHANZADI, SH. AFANDIZADEH, and I. ABRISHMACHI, “PREDICTION OF HIGHWAY CONSTRUCTION DELAY DUE TO WEATHER IMPACT USING FUZZY-PROBABILISTIC RISK ANALYSIS,” JOURNAL OF TRANSPORTATION RESEARCH, vol. 8, no. 3 (28), pp. 211–224, 2011, [Online]. Available: https://sid.ir/paper/83808/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button