Information Journal Paper
APA:
CopyGHOSEYRI, K., & JALIL VAND, FARAMARZ. (2007). ESTIMATING MARGINAL COSTS FOR THE INFRASTRUCTURE OF IRANIAN RAILWAY NETWORK USING AN ECONOMETRIC APPROACH. JOURNAL OF TRANSPORTATION RESEARCH, 4(2), 145-155. SID. https://sid.ir/paper/83842/en
Vancouver:
CopyGHOSEYRI K., JALIL VAND FARAMARZ. ESTIMATING MARGINAL COSTS FOR THE INFRASTRUCTURE OF IRANIAN RAILWAY NETWORK USING AN ECONOMETRIC APPROACH. JOURNAL OF TRANSPORTATION RESEARCH[Internet]. 2007;4(2):145-155. Available from: https://sid.ir/paper/83842/en
IEEE:
CopyK. GHOSEYRI, and FARAMARZ JALIL VAND, “ESTIMATING MARGINAL COSTS FOR THE INFRASTRUCTURE OF IRANIAN RAILWAY NETWORK USING AN ECONOMETRIC APPROACH,” JOURNAL OF TRANSPORTATION RESEARCH, vol. 4, no. 2, pp. 145–155, 2007, [Online]. Available: https://sid.ir/paper/83842/en