Information Journal Paper
APA:
CopyAMIRI, MAGHSOUD, MASHATZADEGAN, H.R., AZIZ MOHAMMADI, R., & YAGHOUBI, ALI. (2009). INTRODUCING A HEURISTIC ALGORITHM FOR PROJECT SCHEDULING PROBLEMS WITH THE OBJECT OF MAXIMIZING THE NET PRESENT VALUE IN THE ABSENCE OF RESOURCE CONSTRAINTS. INDUSTRIAL ENGINEERING & MANAGEMENT SHARIF (SHARIF: ENGINEERING), 24(45), 23-29. SID. https://sid.ir/paper/107592/en
Vancouver:
CopyAMIRI MAGHSOUD, MASHATZADEGAN H.R., AZIZ MOHAMMADI R., YAGHOUBI ALI. INTRODUCING A HEURISTIC ALGORITHM FOR PROJECT SCHEDULING PROBLEMS WITH THE OBJECT OF MAXIMIZING THE NET PRESENT VALUE IN THE ABSENCE OF RESOURCE CONSTRAINTS. INDUSTRIAL ENGINEERING & MANAGEMENT SHARIF (SHARIF: ENGINEERING)[Internet]. 2009;24(45):23-29. Available from: https://sid.ir/paper/107592/en
IEEE:
CopyMAGHSOUD AMIRI, H.R. MASHATZADEGAN, R. AZIZ MOHAMMADI, and ALI YAGHOUBI, “INTRODUCING A HEURISTIC ALGORITHM FOR PROJECT SCHEDULING PROBLEMS WITH THE OBJECT OF MAXIMIZING THE NET PRESENT VALUE IN THE ABSENCE OF RESOURCE CONSTRAINTS,” INDUSTRIAL ENGINEERING & MANAGEMENT SHARIF (SHARIF: ENGINEERING), vol. 24, no. 45, pp. 23–29, 2009, [Online]. Available: https://sid.ir/paper/107592/en