Information Journal Paper
APA:
CopyGANJI, MALIHEH, ALINAGHIAN, MAHDI, & SAJADI, S.MOJTABA. (2016). A NEW MODEL FOR OPTIMIZING SIMULTANEOUSLY PROJECTS SELECTION AND RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEM WITH PARTICLE SWARM OPTIMIZATION. PRODUCTION AND OPERATIONS MANAGEMENT, 7(1 (12) ), 235-246. SID. https://sid.ir/paper/217548/en
Vancouver:
CopyGANJI MALIHEH, ALINAGHIAN MAHDI, SAJADI S.MOJTABA. A NEW MODEL FOR OPTIMIZING SIMULTANEOUSLY PROJECTS SELECTION AND RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEM WITH PARTICLE SWARM OPTIMIZATION. PRODUCTION AND OPERATIONS MANAGEMENT[Internet]. 2016;7(1 (12) ):235-246. Available from: https://sid.ir/paper/217548/en
IEEE:
CopyMALIHEH GANJI, MAHDI ALINAGHIAN, and S.MOJTABA SAJADI, “A NEW MODEL FOR OPTIMIZING SIMULTANEOUSLY PROJECTS SELECTION AND RESOURCE- CONSTRAINED PROJECT SCHEDULING PROBLEM WITH PARTICLE SWARM OPTIMIZATION,” PRODUCTION AND OPERATIONS MANAGEMENT, vol. 7, no. 1 (12) , pp. 235–246, 2016, [Online]. Available: https://sid.ir/paper/217548/en