Information Journal Paper
APA:
CopyTAVAKOLI MOGHADAM, R., RAZMI, J., JOULAEI, F., & SAFARI, M.. (2006). SOLVING A FLOW SHOP SCHEDULING PROBLEM WITH UNCERTAIN PROCESSING TIME AND STOCHASTIC DUE DATE BY FUZZY LOGIC AND POSSIBILITY THEORY. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), 40(4 (98)), 477-486. SID. https://sid.ir/paper/14249/en
Vancouver:
CopyTAVAKOLI MOGHADAM R., RAZMI J., JOULAEI F., SAFARI M.. SOLVING A FLOW SHOP SCHEDULING PROBLEM WITH UNCERTAIN PROCESSING TIME AND STOCHASTIC DUE DATE BY FUZZY LOGIC AND POSSIBILITY THEORY. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN)[Internet]. 2006;40(4 (98)):477-486. Available from: https://sid.ir/paper/14249/en
IEEE:
CopyR. TAVAKOLI MOGHADAM, J. RAZMI, F. JOULAEI, and M. SAFARI, “SOLVING A FLOW SHOP SCHEDULING PROBLEM WITH UNCERTAIN PROCESSING TIME AND STOCHASTIC DUE DATE BY FUZZY LOGIC AND POSSIBILITY THEORY,” JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), vol. 40, no. 4 (98), pp. 477–486, 2006, [Online]. Available: https://sid.ir/paper/14249/en