Information Journal Paper
APA:
CopyHAJI, A., & HAJI, R.. (2006). DETERMINING ECONOMIC BATCH QUANTITY WITH REWORK OF DEFECTIVE ITEMS AND WAITING TIME FOR REWORK. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), 40(4 (98)), 507-512. SID. https://sid.ir/paper/14253/en
Vancouver:
CopyHAJI A., HAJI R.. DETERMINING ECONOMIC BATCH QUANTITY WITH REWORK OF DEFECTIVE ITEMS AND WAITING TIME FOR REWORK. JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN)[Internet]. 2006;40(4 (98)):507-512. Available from: https://sid.ir/paper/14253/en
IEEE:
CopyA. HAJI, and R. HAJI, “DETERMINING ECONOMIC BATCH QUANTITY WITH REWORK OF DEFECTIVE ITEMS AND WAITING TIME FOR REWORK,” JOURNAL OF FACULTY OF ENGINEERING (UNIVERSITY OF TEHRAN), vol. 40, no. 4 (98), pp. 507–512, 2006, [Online]. Available: https://sid.ir/paper/14253/en