Information Journal Paper
APA:
CopyTAVAKKOLI MOGHADDAM, R., & NASRI, A.. (2011). MODELING AND SOLVING OF A BI-CRITERIA SCHEDULING PROBLEM FOR A CELLULAR MANUFACTURING SYSTEM WITH SEQUENCE-DEPENDENT CELL SETUP TIMES. JOURNAL OF MECHANICAL ENGINEERING AMIRKABIR (AMIRKABIR), 42(3), 61-72. SID. https://sid.ir/paper/165971/en
Vancouver:
CopyTAVAKKOLI MOGHADDAM R., NASRI A.. MODELING AND SOLVING OF A BI-CRITERIA SCHEDULING PROBLEM FOR A CELLULAR MANUFACTURING SYSTEM WITH SEQUENCE-DEPENDENT CELL SETUP TIMES. JOURNAL OF MECHANICAL ENGINEERING AMIRKABIR (AMIRKABIR)[Internet]. 2011;42(3):61-72. Available from: https://sid.ir/paper/165971/en
IEEE:
CopyR. TAVAKKOLI MOGHADDAM, and A. NASRI, “MODELING AND SOLVING OF A BI-CRITERIA SCHEDULING PROBLEM FOR A CELLULAR MANUFACTURING SYSTEM WITH SEQUENCE-DEPENDENT CELL SETUP TIMES,” JOURNAL OF MECHANICAL ENGINEERING AMIRKABIR (AMIRKABIR), vol. 42, no. 3, pp. 61–72, 2011, [Online]. Available: https://sid.ir/paper/165971/en