مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

3,089
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

237
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

RESOURCE-CONSTRAINED SCHEDULING OF CONSTRUCTION PROJECTS USING THE HARMONY SEARCH ALGORITHM

Pages

  51-60

Abstract

 During the implementation, CONSTRUCTION PROJECTS usually encounter situation that considerably affects the PROJECT SCHEDULING and cost. This study aims at using an improved version of the harmony search algorithm (HSA) to schedule resource constrained CONSTRUCTION PROJECTS. This model is formulated as a global optimization problem. It will determine the duration of each activity to minimize the project total cost. The algorithm tries to find the best duration for each activity so that it leads to the total consumption of the corresponding resource.This may cause some activities to start simultaneously. The improvements have been made to increase the convergence rate and to lower the cost and shorten duration of the project. A numerical example has been proposed to evaluate the efficacy of the algorithm. This algorithm also addresses issues such as multi-resource, resource combination, and resource limit. Two scenarios have been considered for the test problem. The former scenario shows the project scheduled using the minimum duration list and the latter scenario schedules the project using the optimization algorithm. A comparison between the two scenarios shows the effectiveness of the proposed algorithm in decreasing the total cost and duration of the projects.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    GHOLIPOUR, YAGHOOB, & SHAHBAZI, MOHAMMAD MEHDI. (2011). RESOURCE-CONSTRAINED SCHEDULING OF CONSTRUCTION PROJECTS USING THE HARMONY SEARCH ALGORITHM. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), -(SUPPLEMENT), 51-60. SID. https://sid.ir/paper/166421/en

    Vancouver: Copy

    GHOLIPOUR YAGHOOB, SHAHBAZI MOHAMMAD MEHDI. RESOURCE-CONSTRAINED SCHEDULING OF CONSTRUCTION PROJECTS USING THE HARMONY SEARCH ALGORITHM. ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2011;-(SUPPLEMENT):51-60. Available from: https://sid.ir/paper/166421/en

    IEEE: Copy

    YAGHOOB GHOLIPOUR, and MOHAMMAD MEHDI SHAHBAZI, “RESOURCE-CONSTRAINED SCHEDULING OF CONSTRUCTION PROJECTS USING THE HARMONY SEARCH ALGORITHM,” ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. -, no. SUPPLEMENT, pp. 51–60, 2011, [Online]. Available: https://sid.ir/paper/166421/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top