Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Journal Paper

Paper Information

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

3,924
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

1

Information Journal Paper

Title

USING QFD TO ASSESS THE CONSTRUCTION PROJECTS (CASE STUDY: MEHR MASS CONSTRICTION PROJECT IN KURDISTAN PROVINCE)

Pages

  55-66

Abstract

 Mehr construction project is a mass construction project started since 2007 in Iran. The issue of quality increasing is a big challenge since the starting the project both for construction companies and buyers. Although no distinctive quality assessment studies has launched for these projects, there are some different assessments programs which can be applied to study the issue of quality for these mass construction. QFD is one of the best methods for assessing the quality which can cover both buyers and engineer's needs. This paper has applied two QFD strategic and operational methods. The former deals with the mass construction aspect and covers quality development process in management level of production. To do so, two levels are brought into consideration. Using the AHP and QFD, the first level analyzes the obtained information which identifies 16 criteria of building quality and three involving factors in building process. The factors can be identified as design, operator and department of Housing and Urban development determining their role in increasing the quality, as well as their relationship to increase the quality level. The second stage is to detect the compatibility level of ideal quality with the constructed buildings. The results show that three abovementioned factors have the even and equal role in MEHR MASS CONSTRUCTION PROJECT. Also, the project quality index (QPI) estimation for Sanandaj MEHR MASS CONSTRUCTION PROJECT is about 53%. This method can be recommended for almost all CONSTRUCTION PROJECTS.

Cites

References

  • No record.
  • Cite

    APA: Copy

    SOLTANPANAH, HERESH, & HOSEINI, SAID. (2012). USING QFD TO ASSESS THE CONSTRUCTION PROJECTS (CASE STUDY: MEHR MASS CONSTRICTION PROJECT IN KURDISTAN PROVINCE). JOURNAL OF INDUSTRIAL MANAGEMENT, 7(21), 55-66. SID. https://sid.ir/paper/171095/en

    Vancouver: Copy

    SOLTANPANAH HERESH, HOSEINI SAID. USING QFD TO ASSESS THE CONSTRUCTION PROJECTS (CASE STUDY: MEHR MASS CONSTRICTION PROJECT IN KURDISTAN PROVINCE). JOURNAL OF INDUSTRIAL MANAGEMENT[Internet]. 2012;7(21):55-66. Available from: https://sid.ir/paper/171095/en

    IEEE: Copy

    HERESH SOLTANPANAH, and SAID HOSEINI, “USING QFD TO ASSESS THE CONSTRUCTION PROJECTS (CASE STUDY: MEHR MASS CONSTRICTION PROJECT IN KURDISTAN PROVINCE),” JOURNAL OF INDUSTRIAL MANAGEMENT, vol. 7, no. 21, pp. 55–66, 2012, [Online]. Available: https://sid.ir/paper/171095/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top