مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

3,109
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

IDENTIFYING AND PRIORITIZING OF RISKS IN ELECTRIC INDUSTRY DEVELOPMENT PROJECTS (CASE STUDY: TRANSMISSION AND HIGH DISTRIBUTION OF KHORASAN REGIONAL ELECTRIC CO.)

Pages

  107-116

Abstract

 Each year, many large scale national projects face to operational problems. In this regard, risk management can play a significant role in identifying and taking preventive activities. In this research, using PROJECT MANAGEMENT BODY OF KNOWLEDGE (PMBOK), a risk management procedure has been designed and implemented in transmission and high distribution power lines of Khorasan Regional Electric Company. First, different kinds of risks in transmission and high distribution power lines have been identified. Next, risks analysis have been carried out based on probability of occurrence, ease of detection, manageability as well as their impact on project goals. The rate of goals achievement was taken into account by three criteria including time, cost and quality of execution. This was followed by classification of the risks, through RISK BREAKDOWN STRUCTURE, and their prioritization. The results have shown that budget shortage, sanctions issues, improper selection of project team, are the main risks in the projects considered in this research. The proposed approach in this study, with minor modifications, may be employed to manage the risks in other large scale national projects.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    KOLAHAN, F., REZAYINIK, E., RAMEZANPOUR, H., HASSANI DOUGHABADI, M., & TAJADOD, A.. (2015). IDENTIFYING AND PRIORITIZING OF RISKS IN ELECTRIC INDUSTRY DEVELOPMENT PROJECTS (CASE STUDY: TRANSMISSION AND HIGH DISTRIBUTION OF KHORASAN REGIONAL ELECTRIC CO.). ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), 49(1), 107-116. SID. https://sid.ir/paper/166504/en

    Vancouver: Copy

    KOLAHAN F., REZAYINIK E., RAMEZANPOUR H., HASSANI DOUGHABADI M., TAJADOD A.. IDENTIFYING AND PRIORITIZING OF RISKS IN ELECTRIC INDUSTRY DEVELOPMENT PROJECTS (CASE STUDY: TRANSMISSION AND HIGH DISTRIBUTION OF KHORASAN REGIONAL ELECTRIC CO.). ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING)[Internet]. 2015;49(1):107-116. Available from: https://sid.ir/paper/166504/en

    IEEE: Copy

    F. KOLAHAN, E. REZAYINIK, H. RAMEZANPOUR, M. HASSANI DOUGHABADI, and A. TAJADOD, “IDENTIFYING AND PRIORITIZING OF RISKS IN ELECTRIC INDUSTRY DEVELOPMENT PROJECTS (CASE STUDY: TRANSMISSION AND HIGH DISTRIBUTION OF KHORASAN REGIONAL ELECTRIC CO.),” ADVANCES IN INDUSTRIAL ENGINEERING (JOURNAL OF INDUSTRIAL ENGINEERING), vol. 49, no. 1, pp. 107–116, 2015, [Online]. Available: https://sid.ir/paper/166504/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button