مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

815
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Investigation of Jamming Possibility of Tunnel Boring Machine (TBM) – A Case Study: Qom Metro Project

Pages

  1-13

Keywords

Tunnel boring machine (TBM)Q1

Abstract

 Summary The phenomenon of TBM jamming is one of the most hazards in full mechanized Tunneling projects that should be considered at design time. This paper investigates the jamming possibility around full face excavation machine in Qom metro project. To achieve this purpose, different solution methods including empirical relations, analytical solutions and Numerical modeling have been used. Since the excavation environment is continuous, to analyze the Tunnel based on the numerical method, the Plaxis 3D software is used. Based on the results, in some areas, there are face instability and also the possibility of TBM jamming. It should be mentioned that the obtained results are function of the analysis method so that the calculated support pressure in numerical modellings is larger than its value in the other methods. Introduction Tunneling in weak and low resistance environments presents significant design challenges. As the resistance parameters of these media are low, the displacement analysis and the assessment of the non-elastic zone characteristics are very important, especially in areas where there are numerous high-rise buildings. Furthermore, the Tunneling-induced ground displacement has a great influence on existing urban structures, and the evaluation of displacements (in the design stage) is a difficult subject, which many Tunneling engineers have encountered. In these media, Tunneling by TBM is an effective method to control the ground displacements. However, when a large time dependent deformation occurs around the Tunnel, the ground pressure imposed on TBM shield could cause TBM jamming. Therefore, the jamming prediction in full mechanized Tunneling projects is an essential part of Tunnel design and machine selection. Methodology and Approaches The Qom metro project is one of important urban Tunneling projects in Iran. In this project, about 10 kilometers of the entire Tunnel are excavated by an earth pressure balance (EPB) shield TBM. The main purpose of this paper is to investigate the jamming possibility surrounding shield of EPB-TBM in the Qom metro project. The pressure required for the face stability was calculated using empirical, analytical and numerical methods. The Numerical modeling in this study is carried out using Plaxis 3D software. Moreover, a comparison is made between the results of different methods. Finally, the effect of various parameters on the face stability and jamming possibility is evaluated via Sensitivity analysis carried out in this research work. Results and Conclusions According to the results, when the ratio of overburden to Tunnel diameter is more than 2, the results of the analytical and numerical methods are similar. The differences in results are due to differences in the parameters and the behavioral model used in the Numerical modeling and analytical methods. For example, in some analytical methods, for excavation medium, the elastic behavior is considered, while in three-dimensional (3D) Numerical modeling, several non-elastic behaviors could be considered.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    MOVAHEDI, F., SOLTANI, F., JALALIFAR, H., & MOHAMMADI, H.. (2019). Investigation of Jamming Possibility of Tunnel Boring Machine (TBM) – A Case Study: Qom Metro Project. TUNNELING & UNDERGROUND SPACE ENGINEERING, 8(1 ), 1-13. SID. https://sid.ir/paper/231592/en

    Vancouver: Copy

    MOVAHEDI F., SOLTANI F., JALALIFAR H., MOHAMMADI H.. Investigation of Jamming Possibility of Tunnel Boring Machine (TBM) – A Case Study: Qom Metro Project. TUNNELING & UNDERGROUND SPACE ENGINEERING[Internet]. 2019;8(1 ):1-13. Available from: https://sid.ir/paper/231592/en

    IEEE: Copy

    F. MOVAHEDI, F. SOLTANI, H. JALALIFAR, and H. MOHAMMADI, “Investigation of Jamming Possibility of Tunnel Boring Machine (TBM) – A Case Study: Qom Metro Project,” TUNNELING & UNDERGROUND SPACE ENGINEERING, vol. 8, no. 1 , pp. 1–13, 2019, [Online]. Available: https://sid.ir/paper/231592/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button