مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

1,930
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Identification and Prioritization of Contractor Selection Criteria in EPC Contracts Using AHP and Topsis Methods

Pages

  37-43

Abstract

 The first studies to choose Contractors in EPC Contracts are back in the years ahead. Studies have shown that the existence of a contractor in EPC Contracts is considered to be important for Contractors and reduces risk, cost, and overall improvement of project objectives. General Contractors have limited workload in specialized disciplines and it is inefficient to take full-time specialized labor force and carry out the operation, maintenance and control of specialized machinery with a high cost for them. As a result, Contractors in EPC Contracts that specialize in one or more specific fields of activity will be able to perform specialized work at a lower cost and higher quality. This research, using two qualitative and quantitative approaches, identifies and prioritizes selection criteria for Contractors, which was done through interviewing AHP and TOPSIS methodology. The results indicated that 12 factors such as executive, financial and engineering teams are involved in contractor selection in EPC Contracts.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    asadi, feridoon, & GHORBANI, ALI. (2019). Identification and Prioritization of Contractor Selection Criteria in EPC Contracts Using AHP and Topsis Methods. CIVIL AND PROJECT JOURNAL, 1(2 ), 37-43. SID. https://sid.ir/paper/268487/en

    Vancouver: Copy

    asadi feridoon, GHORBANI ALI. Identification and Prioritization of Contractor Selection Criteria in EPC Contracts Using AHP and Topsis Methods. CIVIL AND PROJECT JOURNAL[Internet]. 2019;1(2 ):37-43. Available from: https://sid.ir/paper/268487/en

    IEEE: Copy

    feridoon asadi, and ALI GHORBANI, “Identification and Prioritization of Contractor Selection Criteria in EPC Contracts Using AHP and Topsis Methods,” CIVIL AND PROJECT JOURNAL, vol. 1, no. 2 , pp. 37–43, 2019, [Online]. Available: https://sid.ir/paper/268487/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button