مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Verion

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

2,017
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

0
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

Information Journal Paper

Title

Optimized method for calculating weight percent for construction projects A Case Study of the Tropical Design-Second Part Water Transmission System Project

Pages

  53-61

Abstract

 Determining the percentage of project progress is one of the most important issues in the "planning" and "control" phases of project management and control for all. Beneficiaries of the organization, including employers and contractors, are of great importance. In most cases, both cost and time factors are used to determine the percentage of actual project progress. However, in practice, there are many effective factors that ignoring them or rendering them inadequate makes the percentage of project progress declared inconsistent with reality. Therefore, the main purpose of this paper is to estimate the rate of project progress taking into account all the criteria that influence the project progress.

Cites

  • No record.
  • References

  • No record.
  • Cite

    APA: Copy

    GHORBANI, ALI, Pourhosein zakariaee, Mostafa, & Shokati Gourabi, Fatemeh. (2019). Optimized method for calculating weight percent for construction projects A Case Study of the Tropical Design-Second Part Water Transmission System Project. CIVIL AND PROJECT JOURNAL, 1(4 ), 53-61. SID. https://sid.ir/paper/268489/en

    Vancouver: Copy

    GHORBANI ALI, Pourhosein zakariaee Mostafa, Shokati Gourabi Fatemeh. Optimized method for calculating weight percent for construction projects A Case Study of the Tropical Design-Second Part Water Transmission System Project. CIVIL AND PROJECT JOURNAL[Internet]. 2019;1(4 ):53-61. Available from: https://sid.ir/paper/268489/en

    IEEE: Copy

    ALI GHORBANI, Mostafa Pourhosein zakariaee, and Fatemeh Shokati Gourabi, “Optimized method for calculating weight percent for construction projects A Case Study of the Tropical Design-Second Part Water Transmission System Project,” CIVIL AND PROJECT JOURNAL, vol. 1, no. 4 , pp. 53–61, 2019, [Online]. Available: https://sid.ir/paper/268489/en

    Related Journal Papers

    Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button