Information Journal Paper
APA:
CopyLOUGH, K.G., STONE, R.B., & TUMER, I.. (2008). IMPLEMENTATION PROCEDURES FOR THE RISK IN EARLY DESIGN (RED) METHOD. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), 2(2), 126-143. SID. https://sid.ir/paper/307078/en
Vancouver:
CopyLOUGH K.G., STONE R.B., TUMER I.. IMPLEMENTATION PROCEDURES FOR THE RISK IN EARLY DESIGN (RED) METHOD. JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE)[Internet]. 2008;2(2):126-143. Available from: https://sid.ir/paper/307078/en
IEEE:
CopyK.G. LOUGH, R.B. STONE, and I. TUMER, “IMPLEMENTATION PROCEDURES FOR THE RISK IN EARLY DESIGN (RED) METHOD,” JOURNAL OF INDUSTRIAL AND SYSTEMS ENGINEERING (JISE), vol. 2, no. 2, pp. 126–143, 2008, [Online]. Available: https://sid.ir/paper/307078/en