مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

video

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

sound

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Persian Version

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View:

241
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Download:

137
مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

Cites:

1

Information Journal Paper

Title

A THREE-STAGE ASSEMBLY FLOW SHOP SCHEDULING PROBLEM WITH BLOCKING AND SEQUENCE-DEPENDENT SET UP TIMES

Pages

  1-7

Abstract

 This paper considers a three-stage ASSEMBLY FLOWSHOP SCHEDULING problem with SEQUENCE-DEPENDENT SETUP TIMES at the first stage and BLOCKING TIMES between each stage in such a way that the weighted mean completion time and MAKESPAN are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditional approaches or optimization tools is extremely difficult. Thus, this paper proposes a meta-heuristic method based on SIMULATED ANNEALING (SA) in order to solve the given problem. Finally, the computational results are shown and compared in order to show the efficiency of our proposed SA.

Cites

References

  • No record.
  • Cite

    APA: Copy

    MALEKI DAROUNKOLAEI, AREF, MODIRI, MAHMOUD, TAVAKKOLI MOGHADDAM, REZA, & SEYYEDI, IMAN. (2012). A THREE-STAGE ASSEMBLY FLOW SHOP SCHEDULING PROBLEM WITH BLOCKING AND SEQUENCE-DEPENDENT SET UP TIMES. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, 8(8), 1-7. SID. https://sid.ir/paper/309923/en

    Vancouver: Copy

    MALEKI DAROUNKOLAEI AREF, MODIRI MAHMOUD, TAVAKKOLI MOGHADDAM REZA, SEYYEDI IMAN. A THREE-STAGE ASSEMBLY FLOW SHOP SCHEDULING PROBLEM WITH BLOCKING AND SEQUENCE-DEPENDENT SET UP TIMES. JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL[Internet]. 2012;8(8):1-7. Available from: https://sid.ir/paper/309923/en

    IEEE: Copy

    AREF MALEKI DAROUNKOLAEI, MAHMOUD MODIRI, REZA TAVAKKOLI MOGHADDAM, and IMAN SEYYEDI, “A THREE-STAGE ASSEMBLY FLOW SHOP SCHEDULING PROBLEM WITH BLOCKING AND SEQUENCE-DEPENDENT SET UP TIMES,” JOURNAL OF INDUSTRIAL ENGINEERING INTERNATIONAL, vol. 8, no. 8, pp. 1–7, 2012, [Online]. Available: https://sid.ir/paper/309923/en

    Related Journal Papers

  • No record.
  • Related Seminar Papers

  • No record.
  • Related Plans

  • No record.
  • Recommended Workshops






    Move to top
    telegram sharing button
    whatsapp sharing button
    linkedin sharing button
    twitter sharing button
    email sharing button
    email sharing button
    email sharing button
    sharethis sharing button